Career Day From Long Leads Field Hockey To Big Win At Hood
FREDERICK, Md. – Sorrell Long assisted on the first two goals of the game and then scored in the third quarter to give the Lebanon Valley field hockey team a 4-0 victory at Hood College on Saturday afternoon.
Read more at Lebanon Valley College Athletics